Carbon Reduction Plan

Prepared in accordance with PPN 006 (formerly PPN 06/21) and its Annex A reporting template

Procurement Policy Note 006: Taking account of Carbon Reduction Plans in the procurement of major government contracts

Supplier name: RedboxVR Ltd

Publication date: 09/09/2026

Plan reporting period: 1 October 2024 – 30 September 2025

Next review date: By 30 September 2027 (within 12 months of publication)

Commitment to achieving Net Zero

RedboxVR Ltd is committed to achieving Net Zero emissions by 2045 across Scope 1, Scope 2 and all relevant Scope 3 emissions, within a global operational boundary.

This Carbon Reduction Plan sets out RedboxVR Ltd’s environmental management measures and carbon emission reduction targets, and details the organisation’s progress towards achieving Net Zero. It has been prepared in accordance with PAS 2060, the requirements of PPN 006, and the reporting standard for Carbon Reduction Plans set out in Annex A.

Baseline Emissions Footprint

Baseline emissions are a record of the greenhouse gases that have been produced in the past, and are used as a reference point against which emissions reduction can be measured.

Baseline Year: FY 2024/25 (1 October 2024 – 30 September 2025)

Additional Details Relating to the Baseline Emissions Calculations

Emissions SourceBaseline Year FY24/25FY25/26FY26/27Current Year [FYxx/xx]
Scope 1 (Direct emissions)1.56 tCO2e
Scope 2 (Purchased electricity, location-based)9.86 tCO2e
Scope 3 (Included Sources)15.13 tCO2e
Total Emissions26.55 tCO2e

Waste generated in operations is calculated using Biffa’s actual waste disposal report (13 months of invoiced collections, Aug 2025-Aug 2026), showing 98.28% of general waste is diverted from landfill by weight.

Scope 3 Categories Included

RedboxXR reports the following Scope 3 categories for FY24/25: the five categories mandated under PPN 006, plus one voluntary category (Fuel and energy related activities), calculated ahead of the minimum requirement.

  • Business travel
  • Employee commuting
  • Downstream transportation and distribution
  • Waste generated in operations
  • Upstream transportation and distribution
  • Fuel and energy related activities (voluntary)

Current Emissions Reporting

Reporting Year: FY25/26 – 1 Oct 2025 – 30 Sep 2026 – Currently in progress

Emissions SourceBaseline Year FY24/25FY25/26FY26/27Current Year [FYxx/xx]
Scope 11.56 tCO2eNot yet available – FY25/26 in progress
Scope 29.86 tCO2eNot yet available – FY25/26 in progress
Scope 3 (included sources)15.13 tCO2eNot yet available – FY25/26 in progress
Total Emissions26.55 tCO2eNot yet available – FY25/26 in progress

Emissions reduction targets

RedboxVR Ltd has adopted a target of Net Zero emissions by 2045, from a 2024/25 baseline of 26.55 tCO2e (Scope 1, 2 and the Scope 3 categories reported above). A fully quantified interim reduction pathway, including five-yearly milestones, is currently being developed and will be published in the next annual review of this plan.

Progress against these targets will be reported below in future updates of this document.

Carbon Reduction Projects

Completed carbon reduction initiatives

The following environmental management measures and projects have been completed or implemented since the baseline year:

Carbon reduction targets and planned initiatives

RedboxVR Ltd has already put in place a number of measures ahead of the 2024/25 baseline being fully measured, and intends to implement further measures to continue reducing emissions, including:

  • Implement a formal environmental management system
  • Engage top 5 suppliers on their own decarbonisation plans
  • Move to a fully renewable electricity tariff at next contract renewal in 2028
  • Replace the remote sales team’s ICE vehicle with an electric vehicle – already ordered, delivery pending
  • The impact of these measures on RedboxXR’s overall emissions will be quantified and reported in future annual reviews of this plan, alongside the interim reduction milestones referenced above.

Declaration and Sign Off

This Carbon Reduction Plan has been reviewed and signed off by the board of directors (or equivalent management body).

Name: Simon Fretwell
Position: CEO
Date: 28/08/2026

القائمة